RFFlow 5 Professional Flowcharting

Professional Flowcharting Software

Home | Samples | Overview | Free Trial | Tutorial | Purchase | Upgrade | Support | Search

PERT/CPM Chart

PERT/CPM Chart

Description
PERT stands for Program Evaluation and Review Technique. The numbered circles represent tasks or milestones in a project. The arrows show the sequence of these tasks. The time to do a task is shown near the arrow. The critical path in the chart shown above is drawn with red arrows. PERT charts display task dependencies, showing which tasks need to be done before others can be started. CPM stands for Critical Path Method.
Drawing Instructions
If you haven't already done so, first download the free trial version of RFFlow. It will allow you to open any chart and make modifications.

Once RFFlow is installed, you can open the above chart in RFFlow by clicking on pert_hardware.flo. From there you can zoom in, edit, and print this sample chart. It is often easier to modify an existing chart than to draw it from scratch.

To draw this chart without downloading it, run RFFlow and click on the More Shapes The More Shapes Button button, click the Pert, CPM, CPA Charts stencil, and then click the Add Stencil button.

Register
| Documentation | Privacy and Security | Version Information | Free Additional Shapes | Software Resellers | Free Viewer | Contact | Full Version
RFF Electronics
PO Box 1244 a gray dot Loveland CO 80539-1244 USA a gray dot Phone 970 663 5767 a gray dot www.rff.com a gray dot rff@rff.com
Copyright © 1996-2024 RFF Electronics. All rights reserved.